Value analysis

Tourniquet cost savings & inventory reduction calculator.

Compare your current tourniquet cuff spend, capital equipment costs, and inventory footprint against the wireless ACTS platform. Model 3-year savings, OR time reclaimed, and the value of moving from five cuff sizes to two.

What this calculator covers

Surgical facilities typically stock five or more tourniquet cuff sizes, maintain a pole-mounted compressor, and manage reusable cuffs through sterile processing. This calculator lets you input your current tourniquet cuff costs, capital expense, inventory SKU count, and setup time, then see how ACTS changes the equation.

  • Current cuff spend (single-use & reusable)
  • Tourniquet machine capital expense
  • Inventory reduction: fewer cuff sizes
  • OR setup time and turnover impact
  • 3-year cost comparison & sensitivity
  • Clinical risk & infection avoidance

Saved scenarios

Save a set of cuff costs and machine payment terms, then switch between them instantly. Scenarios stay on this device.

Facility profile

Every field is optional — we start from typical benchmarks and update instantly.

4 ORs

How many different reusable cuff sizes (SKUs) you stock today. ACTS covers the same limb range with 2.

Current workflow & costs

Enter your own numbers below for a like-for-like comparison. Leave blank to use published benchmarks.

$

What you paid for one tourniquet pump / machine.

Useful life you depreciate the machine across (years).

$

Price you currently pay per single-use cuff.

$

Price per reusable cuff — modeled across a 10-case service life.

3 min / case
$

Industry benchmark is $46.04 per OR minute — edit to match your facility.

Benchmark assumptions

Dial the underlying benchmarks up or down so the estimate matches your internal expectations.

Conservative discounts staff time value; aggressive assumes fully loaded OR labor.

Conservative assumes leaner current consumable spend; aggressive assumes typical high-end reusable cuff upkeep.

Modeling your numbers…

This takes a second. Your results appear here as soon as the model finishes.

These results still use published benchmarks

Add 3 more numbers for an estimate built on your facility’s actual costs.

Assumptions & disclaimer

These figures are directional estimates driven by the inputs above and published OR benchmarks. Actual savings, pricing, and terms depend on your facility’s specific proposal and agreement with Bezalel Innovations.

Inventory footprint

Multi-size cuff library vs. 2 ACTS sizes

Each bar shows the relative carrying load of your cuff library — the SKUs stocked, stored, reprocessed and replaced. Your current library is the 100% baseline.

  • Current library100% of today’s load

    5 SKUs · 5 cuff sizes stocked, washed & tracked

  • ACTS library40% of today’s load

    2 SKUs · 2 adaptive sizes cover the same case mix

60% fewer cuff SKUs to store, reprocess and replace after switching to ACTS.
MetricLegacy systemsACTS program
Inventory management5 cuff sizes stocked2 adaptive sizes (60% inventory reduction)
Equipment upkeepService contracts & CapExForever warranty & $0 CapEx
Workflow speed2–3 min finding the right size cuff, setup, cleaningTubeless / under 30-sec turnaround

Where the savings come from

OR labor & turnaround0%
Equipment, SKUs & upkeep0%
Infection-risk exposure0%

Figures are directional estimates based on your inputs and published OR benchmarks. A customized breakdown is prepared by our value analysis team.

Schedule a 15-minute value analysis

Estimated savings

Calculating…